Current Projects

Please also see our Completed Projects page for details of previous projects undertaken.


St Peter & St Paul, Dry Drayton, Cambridge

St Peter & St Paul, Dry Drayton, Cambridge

This contract includes the delicate replacement of stone to many of the columns.

The floor tiles are being taken up and replaced with Woodkirk sandstone, and plastering is being carried out on the walls.

Once this is all complete, a new kitchen and toilet are being fitted.

 

View Dry Drayton Gallery

Woodkirk Sandstone steps

St Mary's Church, March

A new ramp, with 2 sets of steps, the larger set curved.

Designed by Shona Mckay, Archimage Architects.

View St Mary's Gallery

St Wendreda, March

Dismantling of the parapet and pinnacles, reconstruction with new backing brick and stone.  Replacement of the existing concrete gutter with new timber gutter to new falls, new lead lining and sheet roofing to bays adjacent to east and west abutments.  New cast iron downpipes to north elevation and lead overflow chutes.

 

 

 

View St Wendreda Gallery

Freemasons Hall, Cambridge

Freemasons' Hall, Cambridge

11 new stone windows, 1 stone door, 18 m of plinth, quions and coping.

Taking out of the original arches; windows and door had to be carried out carefully, as they are to be used on a future project.

 

View Freemasons Hall Gallery

Moving of font

St James' Church, Stretham

Internal church modifications.  We are forming a new doorway into the turret at first floor level, ready to adjoin a new level into the tower.

Moving the font, lifting and re-laying monument stones into a new location, and replacing column caps.

Architect: Shona R Mckay, RIBA GRAD.DIP.CONS. (AA).  AABC ACCREDITED

 

 

 

 

View Stretham Gallery

Sawston Hall

On this project the client aims to restore this wonderful building back to its original glory.  Unfortunately, due to previous shortage of funding, the building had not been restored in a sympathetic manner.  This is a listed building, and hence our work is under the watchful eye of a conservation officer.

To date we have rebuilt 6 gables, 4 on the front elevation and 2 on the rear, using as much original stone as poosible, and replacing any unusable stone with locally quarried Barrington clunch.

Doorways have been cut through walls up to 3 feet thick, windows have been replaced, and brickwork chimney stacks have been rebuilt, including new stone cappings weighing almost 1 tonne each.

Marble and Portland stone flooring has been reinstated into the chapel.

 

View Sawston Hall Gallery

Stone is being fixed

Woodlands Road, Cambridge

A very modern stone cladding extension, hanging from corbel brackets.

View Woodlands Road Gallery

Scaffold errection

Peterhouse College

Work to be carried out on this phase includes turret stone replacement, battlement ashlar replacement, mortar repairs and leadwork to copings.

View Peterhouse Gallery

Studham

St Mary the Virgin, Studham

Masonry repairs to the south aisle, invesigative work to cracks in the chancel, and other minor repairs.

2 new windows, re-rendering to nave south wall, new leadwork flasings, guttering and downpipes.

 

 

View Gallery

Other current projects:

Elsworth Church, Nave wall repairs

Peterhouse College: Phase 3

Scott Polar institute, stone steps and paving

Stotfold Church: Phase 3

Emmanuel College, new doorways, stone cleaning, steps and paving

Various supply contracts to local construction companies